End frame

Place an order

Place an order

Choose the quantity and leave your details. We will confirm the order, availability and delivery date.

  • Fits Plettac-compatible scaffolding
  • Available in a set or as a single part
  • Polish manufacturer

End frame – from the EDX70 scaffolding manufacturer

The EDX 70 upper end frame forms the front termination of the highest working level of the facade scaffolding. It creates a barrier at the end of the platform run where securing the open edge is required. It completes the system of protective guardrails, helping to prepare the workstation for work at height.

S235 steel protected by hot-dip galvanising was used to make the frame. Steel provides mechanical strength, and the zinc coating reduces the corrosion of the surface exposed to moisture and weather conditions. Such workmanship promotes the durability of the element during repeated use.

The frame is used in facade scaffolding employed for building insulation, plastering and facade renovation. Its function is to close the front of the highest lift and complete the protection of the working area.

You can order it together with a scaffolding set or individually, to fill gaps or replace worn parts.

Typical use

  • assembling new sets
  • replacement of worn or damaged frames
  • extending scaffolding compatible with Plettac